ColdPoint Logistics | Kansas City, KS
Description
COLDPOINT LOGISTICS
KANSAS CITY, KS
624,390 TOTAL SF FOUR-PHASED COLD STORAGE FACILITY
__________Phase I: 161,000 SF Freezer/Cold Dock Distribution Facility
- 34,000 SF Cold Dock
- 113,000 SF -10°F Freezer
- 5,200 SF Mechanical Room
- 8,400 SF Two-Story Office
- 34,000 SF Cold Dock
- 113,000 SF -10°F Freezer
- 5,200 SF Mechanical Room
- 1,210 SF Office
- 34,000 SF Cold Dock
- 42,237 SF -10°F Freezer
- 73,562 SF Cooler with Refrigeration Capabilities to Convert to -10°F Freezer
- 5,200 SF Mechanical Room
- 2,062 SF Battery Charging Room
- 10,025 SF Office
- 55,000 SF Cold Dock
- 35,000 SF Convertible Rooms where Temperature can be -10°F to 36°F
- 54,792 SF -10°F Freezer with Slow Freeze Capabilities
- 4,500 SF Boxing and Blast Automation Room for Daily Wash Down
- Two-Story Office
- Seven (7) Blast Cells each with Forty-Eight (48) Pallet Capacity and the Ability to Freeze from 38°F to -5°F in 24 Hours
- Railroad Spur Servicing the Building
- IMP and Insulated Tilt-Up Concrete Construction
- 36' Clear Height
- Ammonia Refrigeration System
- Design/Build Delivery
- - Chad Meyer, President & COO | ColdPoint Logistics