Skip to main content

LIFE SCIENCE CONSTRUCTION

Camber Development

ADVANCED MANUFACTURING FACILITY IN BEDFORD, MA

Designed and built for Camber Development, this project is a 174,000-total-square-foot advanced manufacturing facility.

This 174,000 SF advanced manufacturing facility was designed with efficiency and scalability in mind to support the evolving needs of the life sciences industry. It includes a 105,000 SF warehouse and a 42,000 SF mezzanine, along with six dock positions to streamline logistics. Built with structural steel construction, the facility features insulated metal panel and curtain wall façades, shallow foundations, and a 36’ clear height, offering a durable and adaptable space for operations.

Key infrastructure includes an 8,000-amp electrical service and a 60-mil, mechanically attached TPO roof system equipped with a vapor barrier. Provisions have been made for future tenant mechanical, electrical, and plumbing (MEP) equipment, dunnage installations, and additional mezzanine expansions. The structure was specifically designed to accommodate growing tenant needs while ensuring operational continuity.

Additional features include an outdoor amenity space to enhance employee well-being and support modern workplace standards. With its combination of advanced design, functionality, and capacity for growth, this facility sets a high standard for life science manufacturing spaces.

PROJECT STATUS

Complete

SIZE

174,000 Square Feet

INDUSTRY

Life Science

Related Projects

ARCO is a trusted contractor for life science facilities, including cGMP manufacturing, medical device manufacturing, laboratories, research and development, speculative life science, pharmaceutical processing, pharmaceutical storage and distribution, and contract research organizations. ARCO is expertly capable of providing efficient, top-tier solutions for the evolving needs of the life sciences and pharmaceutical industries.