Horizons Industrial Spec I-VI | Kansas City, MO

lorem ipsum
Recommend
  • Facebook
  • Twitter
  • LinkedIN
  • Pinterest
Share
Tagged in
Description

HORIZONS INDUSTRIAL SPEC I-VI KANSAS CITY, MO

 

1,767,000 SF INDUSTRIAL PARK WITH SIX SPECULATIVE WAREHOUSES

__________

155,884 SF Speculative Warehouse I
  • 28' Clear Height
  • 50' x 50' Interior Bays and 50' x 50' Staging Bays
  • Soil Cement Stabilization
  • 7" Concrete Floor Slab
  • Load Bearing Tilt-Up Concrete Construction
  • 15 Dock Positions Including 35,000 lb Capacity Levelers, Dock Seals and Swing Lights
  • 3 12' x 14' Motor Operated Drive-In Doors
  • Mechanically Fastened 45 mil TPO Roof System
  • ESFR Sprinkler System
  • Roof Mounted Solar Panels
  • Warehouse Heating to Maintain 49° Inside and 0° Outside
  • 1200 AMP Electrical Service
  • 30 fc Level Lighting Achieved Thru T5 HO Fluorescent Light Fixtures with Motion Sensors
  • LEED® Certified
  • Design/Build Delivery
  169,025 SF Speculative Warehouse II
  • 28' Clear Height
  • 50' x 50' Interior Bays and 50' x 60' Staging Bays
  • Soil Cement Stabilization
  • 7" Concrete Floor Slab
  • Load Bearing Tilt-Up Concrete Construction
  • 16 Dock Positions Including 35,000 lb Capacity Levelers, Dock Seals and Swing Lights
  • 3 12' x 14' Motor Operated Drive-In Doors
  • Mechanically Fastened 45 mil TPO Roof System
  • ESFR Sprinkler System
  • Roof Mounted Solar Panels
  • Warehouse Heating to Maintain 49° Inside and 0° Outside
  • 1200 AMP Electrical Service
  • 30 fc Level Lighting Achieved Thru T5 HO Fluorescent Light Fixtures with Motion Sensors
  • LEED® Certified
  • Design/Build Delivery
  196,085 SF Speculative Warehouse III with 139,070 SF Food Distribution Facility for Vistar
  • 18,800 SF 10°F Freezer
  • 5,100 SF 36°F Cold Dock
  • 6,800 SF Office
  • 30' Clear Height
  • 50' x 50' Interior Bays and 50' x 60' Staging Bays
  • Soil Cement Stabilization
  • 7" Thick Concrete Floor Slab
  • Load Bearing Tilt-Up Concrete Construction
  • 26 Dock Positions Including Mechanical and Hydraulic Levelers, Dock Shelters and Seals and Swing Lights
  • 2 12' x 14' Motor Operated Drive-In Doors
  • Mechanically Fastened 45 mil TPO Roof System with R-18, R-24 and R-37 Insulation
  • ESFR Sprinkler System
  • Roof Mounted Solar Panels
  • 2,000 AMP Electrical Service
  • 30 fc Level Lighting Achieved Thru T5 HO Fluorescent Light Fixtures with Motion Sensors
  • LEED® Certified
  • Design/Build Delivery
  341,784 SF Speculative Warehouse IV
  • 32' Clear Height
  • 50' x 50' Interior Bays and 50' x 60' Staging Bays
  • 8" Paved Concrete Truck Aprons
  • 12" Low Volume Change Layer Under Building Pad for Enhanced Stability
  • 7" Concrete Floor Slab
  • Load Bearing Tilt-Up Concrete Construction
  • 36 Dock Positions Including 45,000 lb Capacity Levelers, Dock Shelters and Seals and Swing Lights
  • 4 14' x 16' Motor Operated Drive-In Doors
  • Mechanically Fastened 45 mil TPO Roof System
  • ESFR Sprinkler System
  • Warehouse Heating to Maintain 49°F Inside and 0°F Outside
  • 3,000 AMP Electrical Service
  • T5 HO Fluorescent Light Fixtures with Motion Sensors
  • Decorative Oversized Windows that can be Removed for Future Warehouse Exhaust System Based on Tenant Requirements
  • LEED® Certified
  • Design/Build Delivery
  491,448 SF Speculative Warehouse V
  • 36' Clear Height
  • 7" Concrete Floor Slab
  • 263,000 SF 8" Concrete Paving
  • 292 Car Parking Spaces and 8 Handicap Parking Spaces on 6" Asphalt
  • Tilt-Up Concrete Construction
  • 48 Dock Positions
  • 4 Drive-In Doors
  • Mechanically Fastened 45 mil TPO Roof System with R-25 Insulation
  • R-11 Stickpin Insulation on Exterior Walls from Roof to 14' Above Finish Floor
  • Design/Build Delivery
  412,065 SF Speculative Warehouse VI
  • 36' Clear Height
  • 7" Concrete Floor Slab
  • 263,000 SF 8" Concrete Paving
  • 231 Car Parking Spaces and 10 Handicap Parking Spaces on 6" Asphalt
  • Tilt-Up Concrete Construction
  • 42 Dock Positions
  • 4 Drive-In Ramp Doors
  • Mechanically Fastened 45 mil TPO Roof System with R-20 Insulation
  • R-11 Stickpin Insulation on Exterior Walls from Roof to 14' Above Finish Floor
  • Design/Build Delivery
FROM THE CLIENT:  "ARCO's capacity to understand the full scope of work and offer the best solution has been apparent on each of our projects. Repeatedly, ARCO has proven to deliver their projects in superior condition, on time and on budget." - Chad Meyer, President & COO | NorthPoint Development