Allied Beverage | Sylmar, CA

lorem ipsum
  • Two Level Pick Module in Warehouse at Allied Beverage Distribution Center Built by ARCO Construction
  • Product in Warehouse at Allied Beverage Distribution Center Built by ARCO Construction
  • Hospitality Room with Bar at Allied Beverage Distribution Center Built by ARCO Construction
  • Aerial View of Allied Beverage Distribution Center Built by ARCO Construction
Recommend
  • Facebook
  • Twitter
  • LinkedIN
  • Pinterest
Share
Tagged in
Description

ALLIED BEVERAGE
SYLMAR, CA

 

230,000 SF BEVERAGE DISTRIBUTION CENTER

__________

  • 195,600 SF Controlled Temperature Warehouse
  • 19,655 SF 2-Story Office
  • 9,900 SF Draught Cooler
  • 4,800 SF Maintenance Building
  • 9,310 SF Covered Loading Area
  • 28 Dock Positions
  • Tilt-Up Concrete Walls
  • 98 Trailer Parking Stalls
  • 257 Car Parking Stalls
  • 28' Unobstructed Clear Height
  • Energy Efficient White TPO Membrane Roof
  • Back-Up Generator for Electrical System
  • ESFR Ready Sprinkler System
  • Design/Build Delivery