Tenneco | Spring Hill, TN

lorem ipsum
  • Aerial View with Blue Sky and Clouds of Tenneco Manufacturing Facility Built by ARCO Construction
  • Aerial View of Exterior Dock Positions at Tenneco Manufacturing Facility Built by ARCO Construction
  • Teal Racking at Dock Positions at Tenneco Manufacturing Facility Built by ARCO Construction
  • Air Ducts and Machinery at Tenneco Manufacturing Facility Built by ARCO Construction
Recommend
  • Facebook
  • Twitter
  • Google Plus
  • LinkedIN
  • Pinterest
Share
Tagged in
Description

TENNECO
SPRING HILL, TN

 
118,000 SF AUTOMOTIVE COMPONENT MANUFACTURING FACILITY EXPANSION
__________

  • 6,666 SF Office
  • 2500 AMP Service
  • 1600 AMP Electrical Buss Duct
  • Fume Extraction System with Fully Secured Enclosure
  • Argon, CO2 and Air Compressor with Fully Secured Enclosure
  • Enclosure and Guardrail Protection
  • 5 Air Changes Per Hour
  • Internet Ready Utility Metering Systems to Read Usage Remotely
  • Load Bearing Tilt-Up Concrete Construction
  • 30’ Clear Height
  • 6 Dock Doors and 1 Drive-in Door
  • Fully Fenced, Secured 30 Trailer Parking Lot