ColdPoint Logistics | Edgerton, KS

lorem ipsum
  • Colorful Pipes at ColdPoint Logistics Cold Storage Distribution Facility Built By ARCO Construction
  • Product in Freezer at ColdPoint Logistics Cold Storage Distribution Facility Built By ARCO Construction
  • Interior Docks and Pallets at ColdPoint Logistics Cold Storage Distribution Facility Built By ARCO Construction
  • Docks with Trucks at ColdPoint Logistics Cold Storage Distribution Facility Built By ARCO Construction
Recommend
  • Facebook
  • Twitter
  • Google Plus
  • LinkedIN
  • Pinterest
Share
Tagged in
Description

COLDPOINT LOGISTICS
EDGERTON, KS


3-PHASED COLD STORAGE FACILITY
__________

Phase I: 161,000 SF Freezer/Cold Dock Distribution Facility
  • 34,000 SF Cold Dock
  • 113,000 SF -10°F Freezer
  • 5,200 SF Mechanical Room
  • 8,400 SF 2 Story Office
Phase II: 148,000 SF Freezer/Cold Dock Distribution Facility
  • 34,000 SF Cold Dock
  • 113,000 SF -10°F Freezer
  • 5,200 SF Mechanical Room
  • 1,210 SF Office
Phase III: 166,198 SF Freezer/Cold Dock Distribution Facility
  • 34,000 SF Cold Dock
  • 42,237 SF -10°F Freezer
  • 73,562 SF Cooler with Refrigeration Capabilities to Convert to -10°F Freezer
  • 5,200 SF Mechanical Room
  • 2,062 SF Battery Charging Room
  • 10,025 SF Office
 
  • 3 Blast Cells each with 48 Pallet Capability
  • Freezer from 38°F to -5°F in 24 Hours
  • Railroad Spur Servicing the Building
  • IMP and Insulated Tilt-Up Concrete Construction
  • 36' Clear Height
  • Ammonia Refrigeration System

FROM THE CLIENT:
"Repeatedly, ARCO has proven to deliver their projects in superior condition, on time and on budget. ARCO's capacity to understand the full scope of work and offer the best solution has been apparent on each of our projects. They have proven themselves to be as good as any outside firm we work with and offer expertise in the industrial components of design others may lack."
    - Chad Meyer, President & COO | ColdPoint Logistics