Experience

MISSION CRITICAL FACILITIES


70,000 SF Web Hosting Facility
San Jose, CA


  • 70,000 SF Web Hosting Facility
  • 15,000 SF of Computer Access Flooring
  • 12,000 SF Bunker Type Web Host Data Center
  • 70,000 SF Double Interlock Dry Pipe Pre-Action System Protecting the
  • Entire Facility
  • 14 Static Switches
  • Fiber Optic Conduit On and Off Site with Multiple Access Points into Facility
  • Four-Level Security System
  • N+2 Electrical Redundancy
  • NEMA 1 Primary 21 KV Electrical Service Line Up with One Main Meter and
  • Two Secondary Service Switches Feeding (2) 3000 KVS to 480 V
  • Transformers