ARCO Welcomes Shane Ranz

ARCO Welcomes Shane Ranz

ARCO Welcomes New Cincinnati Project Manager-Shane Ranz


We are pleased to announce that Shane Ranz has joined the ARCO National team as a project manager at our Cincinnati office. Shane comes to ARCO with over 9 years of professional experience. As Project Manager, Shane will be directing all construction and administrative commitments for the jobs in which he handles. This includes project estimating, design management, general contracting, cost control, and scheduling. We are confident that Shane will develop strong, close relationships with our most valued clients and subcontractors. We are delighted to have Shane here at ARCO. Welcome Shane!

ARCO Welcomes Jack Lawler

ARCO Welcomes Jack Lawler


We are pleased to announce that Jack Lawler has joined the ARCO National team as a sales consultant. Jack comes to ARCO with more than 30 years of experience in the foodservice industry. In his new role, Jack will connect his national network of foodservice contacts with ARCO’s team of cold storage and food distribution construction experts.

Chris Wilson Named Shareholder and Principal

Chris Wilson Named Shareholder and Principal


ARCO National Construction is proud to announce that Vice President, Chris Wilson, has become a Principal and Shareholder in the company.

Chris Wilson joined ARCO in 2005 as a Project Manager. He was promoted to Director of Business Development in 2013 and Vice President in 2016. Chris received a Bachelor of Science in Construction Management from Purdue University.

ARCO National Completes Performance Food Group Facility

ARCO National Completes Performance Food Group Facility


ARCO National Construction just recently completed the construction on this 167,763 SF Food Distribution Center. As one of the many Performance Food Group locations completed by ARCO worldwide, this is the first new build completed in the northeastern part of the United States.

Project highlights include:

• 127,990 SF Heated Warehouse
• 23,658 SF -10◦ Freezer
• 8,743 SF Cold Dock
• Refrigerated Freezer and Cold Dock that Utilize a Freon based system with Electric Defrost
• LED Lighting with Motion Sensors
• 2,500 Amp Electrical Service
• Mechanically Fastened 60 mil TPO Roof System

This new food distribution center is well-equipped with the most state-of-the-art technology and equipment to ensure daily operations and management are carried out to PFG’s high standards.

For more finished construction photos of this project follow this link: http://www.arconational.com/projects/performance-food-group-3/

ARCO National Awarded New Automated Sorting Facility Project

ARCO National Awarded New Automated Sorting Facility Project


ARCO National Construction is excited to have been chosen to construct a new automated sorting facility in Twinsburg, Ohio for repeat client, Scannell Properties. Construction has begun and is expected to be completed by November 2016. The facility will be located in a 165 acre redevelopment site of a former Chrysler stamping plant.

 

Project Details:

248,000 SF Automated Sorting Center
53 Dock Positions with Hydraulic Dock Packages
2 Drive-in Doors
8,000 SF Office
Temperature Controlled Facility
Internal Roof Drains
R30 Roof Insulation
Insulated Precast Wall Panel Construction
7” Floor Slab
Diesel Fire Pump
4,000 Amp Electrical Service